Services

Our Electrical Engineering Services

Electrical Inspection Condition Report

Be compliant and stay compliant

An Electrical Installation Condition Report (EICR) is a detailed assessment of your electrical installations.

It can identify areas within your electrical system that require improvement and highlight areas that may not demonstrate compliance.


We love the The Institution of Engineering and Technology blog on "EICR Myths"  that answers some of the

most common questions associated with the EICR.


Businesses are recommended to carry out an Electrical Inspection Conditioning Report at different yearly intervals, the general rule is 3 years for industrial premises and 5 years for other businesses, however an EICR is also required at a change of tenancy.

3 Years

EICR interval in years for industrial premises

5 Years

EICR interval in years for commercial premises
Contact us

New Paragraph

Why is my EICR ‘unsatisfactory’? 

Code Present Meaning Action Type
C1 Danger Present Urgent
C2 Potentially Dangerous Immediate
F1 Further Investigation Required Immediate

This is likely because you had an inspection and one or more of the following codes was documented on your report:


Emergency Lighting

Emergency Lighting Legislation can be stressful

All of your emergency lighting must be in line with BS 5266, this is made up of an effective designinstallation and maintenance of your emergency lighting system. Our team work with you to understand your needs and make sure that you have satisfied the requirements of current legislation, once completed our digital emergency lighting log book makes maintenance of your new system simple.


3hrs

Minimum duration of emergency lighting

££££££

The cost of non compliance can be in the thousands to the hundreds of thousands                         
Contact us

Be compliant and stay compliant

Effective and efficient service

Power Distribution

We're here to help you handle the HV and the LV

New designs

There are many ways you can design a power distribution system, thus choosing the best design for your current and potential future needs is essential.


Making a new purchase

We advise anybody who is purchasing a new premises with privately owned HV to have a full understanding of the  system prior to purchase, we offer a full reporting service that outlines any areas that need attention, that could otherwise result in power failure.

Contact us

Designing your power distribution

01 Identify the required load

02 Determine present and future distribution potential

03 Calculate cable size

04 Switchgear selection


05Ensure adequate protection

06Select containment type

07Communicate with customer


Industrial Automation and Maintenance

Factories: The real power houses

  • Control panel design and installation
  • Machinery installs, modifications and commissioning
  • Whole factory moves
  • Instrument control electrical installation
  • Conveyor systems design, install and commissioning


Contact us

Information Centre

New digital MID meter installed
by PH653212 22 July 2024
Meter Reading? Automate it.
by PH653212 4 June 2023
Thermal Imaging is a powerful and non-invasive tool for monitoring and diagnosing the condition of electrical installations.
emergency lighting installations
5 December 2022
Emergency Lighting: What is it and why does my business need it?
Show More
Share by: